ÉcoPerformance — Implantation simplifiée (Simplified Implementation Track)
Compared with the 242 other application forms we have read
- Scored mainly on environmental outcome. Only 11 lead with that.
- Winning means you must keep the equipment in place and working for a stated period. 12 ask that.
- What does not disqualify you: No Quebec registry entry. 119 record an exemption like this.
Can you win this grant?
Get your instant eligibility verdict plus a head start on the application. Free, no account needed.
We use this program’s real eligibility rules. 4 short questions follow.
Want your full match picture across 850+ programs? Take the 2-minute quiz →
Eligibility & Details
What this program funds and who can apply
Program Description
A Quebec government subsidy program (administered by TEQ under MELCCFP) that calculates aid from the estimated GHG-emissions reduction of the converted system (up to $125/tonne CO2eq. over a 10-year commitment), capped at 75% of eligible costs, for small and medium energy consumers converting from fossil fuel heating or refrigeration systems to lower-emissions alternatives. The Simplified Implementation track covers pre-defined eligible measures in targeted sectors — including oil/propane-to-heat-pump conversions in commercial and multi-unit residential buildings, and heating electrification in maple syrup facilities and greenhouses. The program is distinct from Hydro-Québec's own rebate programs; it is funded by the provincial Cap-and-Trade system and administered through TEQ. Per-site maximum is $250K/year; per-measure maximum is $100K.
Eligibility Requirements
- Eligible participants: for-profit businesses of any size, non-profits and co-operatives (social-economy enterprises), municipal bodies, health/social-services/education/childcare network establishments, sole proprietors, and Indigenous communities/nations recognized by the National Assembly — all with an establishment operating in Quebec
- Large energy consumers are excluded: eligible participants must be a 'petit ou moyen consommateur' (PMC) — non-electric annual energy consumption under 36,000 GJ, roughly under 935,000 L of oil, 1,420,000 L of propane, 950,000 m³ of natural gas, or 1,875,000 kg of biomass
- Eligible sectors include: commercial/institutional/industrial/multi-unit residential buildings (oil or propane heating conversions), maple syrup facilities (fossil fuel heating electrification), and greenhouses (heating electrification)
- Eligible project types (per measure): the maple and building measures require converting an existing oil/propane system; the greenhouse measure also admits a new or expanded greenhouse with no fossil-fuel history (propane is the default reference fuel). The cadre also recognizes energy-efficiency-on-a-fossil-fuel projects as a distinct category alongside a fuel switch.
- Project must be completed within 24 months of the financial-aid agreement taking effect (you may start work on receipt of TEQ's confirmation email, not final approval)
- Professional engineering services not required for impact measurement (simplified track)
- Building-heating measure: annual fossil-fuel consumption must fall between 500–20,000 L of light oil or 750–30,500 L of propane; the site (and every measure) must be connected to Hydro-Québec's grid or a named municipal/cooperative grid — a site on an autonomous or off-grid electricity network is not eligible
- Maple measure: a site with no maple quota (contingent acéricole) is ineligible, however good the conversion — this is the field's most-missed trap
- Greenhouse measure: if eligible expenses exceed $140,000 (before sales tax), you may apply under the standard implementation volet instead, which is not capped at $100K/measure
Quick Assessment
Funding Details
- Amount
- Up to $100K per measure, $250K/site/yrCalculated from the site's estimated annual GHG-emissions reduction × up to $125/tonne CO2eq. over a 10-year commitment period, capped at 75% of eligible costs, $100K per measure, and $250K per site per year
- Type
- Grant
- Level
- Provincial
- Co-Funding
- Up to 75% of eligible costs
- Deadline
- Open continuously — no intake deadline
Program Scorecard
Competition, effort, and approval at a glance
Accessible — straightforward requirements
Low competition — good odds of approval
Easy — minimal documentation
How to Win
Insider tips, common pitfalls, and what successful applicants look like
Insider TipThe Simplified Implementation track is called 'simplified' for a reason — unlike the full ÉcoPerformance program, it does NOT require a professional engineer to measure energy impact, which dramatically reduces your pre-project cost and paperwork.
Success Profile
Evaluation Criteria
How ÉcoPerformance — Implantation simplifiée judges your application
What the reviewer scores, what gets applications rejected, and what to write.
Distilled from 6+ source documents, condensed into one brief. Sources as of 2026-09-11.
6 of the sources
- Aide financière pour un projet d'implantation simplifiée spécifique… quebec.ca
- Programme d’aide financière ÉcoPerformance pour des projets de… quebec.ca
- Convertir un évaporateur d’eau d’érable à l’électricité ou à la… quebec.ca
- Convertir un chauffage au mazout ou au propane à l'électricité ou à… quebec.ca
- Installer un système de chauffage à l’électricité dans une serre quebec.ca
- Cadre normatif du programme ÉcoPerformance cdn-contenu.quebec.ca
Sign up free to save this programme and track your application in your workspace.
What ÉcoPerformance — Implantation simplifiée favours
Formulaire, factures d'énergie 12 mois, photos, rôle foncier◦
“Une demande recevable est constituée: D’un formulaire de demande d’aide financière dûment rempli en version électronique; De factures d’énergie (sur 12 mois); De photos de l’équipement à remplacer (si applicable); D’une procuration (si requise); Du rôle d’évaluation foncière du site visé par la demande (si requise); De tout autre document pertinent (p. ex., horaire d’opération, contingent, etc.).”
The form
Identification
- 1Onglet Instructions — instructions générales (all three workbooks)checkbox
- AA. Participantshort answer
- BB. Signataire autoriséshort answer
- CC. Représentant administratifshort answer
- DD. Siteshort answer
Mesure bâtiment
- 6building oil/propane heating conversionselection
- 7Onglet Consommation actuelle — fuel-delivery ledger (building measure)spreadsheet
- 8G. Déclaration du signataire autorisé (building measure)checkboxes
- 9H- Documents obligatoires à fournir (building measure)checkboxes
- 17Étape 4 – Demande de paiement (building measure)list
Mesure acéricole
- 10maple evaporator conversionselection
- 11F. Déclaration du signataire autorisé (maple measure)checkboxes
- 12G. Documents obligatoires à fournir (maple measure)checkboxes
- 18Étape 4 – Demande de paiement (maple measure)list
Mesure serre
- 13E. Caractéristiques et calendrier de production de la ou des serresspreadsheet
- 14F. Projet (greenhouse measure)table
- 15G. Déclaration du signataire autorisé (greenhouse measure)checkboxes
- 16H- Documents obligatoires à fournir (greenhouse measure)checkboxes
- 19Étape 4 – Demande de paiement (greenhouse measure)list
ÉcoPerformance — Implantation simplifiée states no length limits for these answers.
Judged against
- 1
Are you a small or medium energy consumer?
Show them Show your non-electric consumption stays under 36 000 GJ — roughly 935 000 L of oil or 1 420 000 L of propane.◦
In the funder’s words · 1
- En plus des exigences spécifiées dans les dispositions générales, un participant à ce volet doit être un PMC.
- 2
Which eligible project category does it fit?
What to show, and the funder’s 1 criterion behind it in Premium
- 3
How is the aid amount calculated?
What to show, and the funder’s 1 criterion behind it in Premium
- 4
Is the file recevable as filed?
What to show, and the funder’s 1 criterion behind it in Premium
Where applicants fail
“Si l’ancien équipement n’est pas démantelé dans le cadre du projet, 20 % de la consommation sera retranchée dans le calcul de l’aide financière.”
“Lors de la demande de paiement, l’aide financière sera recalculée en fonction des informations mises à jour du projet. Si le montant de l’aide doit être révisé, il ne sera révisé qu’à la baisse.”
Premium · the rest of this brief
See all 18 rules that can reject you and every criterion you are judged on. Then we draft your application for you.
16 more rules that can reject you · 3 more criteria · 19 more prompts
Do you pass?
Each one can rule you out. Tick the ones you meet.
Your business
Eligible participant type
Les participants admissibles au Programme appartiennent à l’une des catégories suivantes: Une entreprise, de tous les secteurs d’activité (commercial, institutionnel, industriel, agricole ou manufacturier, y compris les secteurs primaire et secondaire), légalement constituée en vertu des lois du gouvernement du Québec ou du Canada et ayant un établissement en activité au Québec. … Une personne physique exploitant une entreprise individuelle; Une communauté autochtone ou une nation autochtone reconnue par l’Assemblée nationale.
PMC: under 36 000 GJ
Petit et moyen consommateur (PMC): Participant ayant une consommation énergétique inférieure à 36 000 GJ par année, autre qu’électrique
1 thing this funder says you do NOT need, in Premium.
Documents to attach
Ticks are kept on this device.
The money
Taux par tonne125 $/t CO₂ éq., 10 ans
L’aide financière est déterminée en fonction de la réduction des émissions de GES annuelle estimée, multipliée par un maximum de 125 $/t CO2 éq. annuel pour une période d’engagement de 10 ans.
Taux mazout bâtiment2 $/litre × consommation annuelle
Mazout = approximativement 2 $/litre x consommation moyenne annuelle des deux dernières années.
Taux propane bâtiment1,30 $/litre
Propane = approximativement 1,30 $/litre
Taux serre3,00 $/L; 2,98 $/L; 1,97 $/L
Mazout no 1: Aide ($) = 3,00 $/L x consommation annuelle (L); Mazout no 2: Aide ($) = 2,98 $/L; Propane: Aide ($) = 1,97 $/L
Formule acéricoleFE × 125 $/t, 10 ans
Aide ($) = [Consommation de combustible x FE (kg/unité) / 1000 kg/t] x 125 ($/t) x 10 ans
Versement uniqueun seul versement
La totalité de l’aide est payée en un (1) seul versement, à la livraison des données pour la reddition de comptes du Programme.
Your share75 % des coûts, max 100 000 $/projet
L’aide financière ne doit toutefois pas dépasser les montants suivants: 75 % des coûts admissibles; 100 000 $ par projet jusqu’à concurrence de 250 000 $ par site annuellement.
Stackingcumul maximal 75 % des dépenses
Le cumul des aides financières directes ou indirectes reçues des ministères, des organismes, des entreprises du gouvernement du Québec et des sociétés d’État des gouvernements du Québec et du Canada, y compris les crédits d’impôt ainsi que des entités municipales qui ne sont pas directement bénéficiaires du Programme, ne doit pas dépasser 75 % des dépenses.
Costs before approvaldépenses admissibles 30 jours avant la demande
La date à partir de laquelle les dépenses liées à un projet sont admissibles au Programme est déterminée par le MELCCFP comme étant 30 jours civils précédents la date de réception d’une demande recevable.
What it pays for · 2
- Le coût d’achat et de remise à niveau de l’équipement, y compris l’équipement requis pour le mesurage de la consommation énergétique; Les coûts des travaux d’ingénierie; Les coûts d’installation; Les coûts de mise en fonction; Les honoraires professionnels; Les coûts de calibration; Les frais de la contribution qui doit être versée au distributeur pour qu’une conversion énergétique puisse se faire.
- Les coûts d’achat, d’installation et de mise en fonction du nouveau système de chauffage; Les coûts de retrait et de démantèlement du système à combustible.
What it does not pay for · 2
- Les salaires et les avantages sociaux des employés du participant; Les frais administratifs et de gestion.
- Les coûts internes ne sont pas admissibles.
From application to money
- Email the workbookEnvoyer le classeur.xls par courriel
- Ministry confirmationMinistère confirme dates et aide maximale
- Do the work24 moisTravaux réalisés dans un délai de 24 mois
- Send the payment requestEnvoyer la demande de paiement signée
- One instalmentUn seul versement
In the funder’s words · 5
- Email the workbook
- Send the completed.xls workbook with its photos, invoices and property roll to [email protected]; there is no portal and no account.
- Ministry confirmation
- The ministry emails back the date d'inscription, the date d'admissibilité des dépenses, the maximum aid and the demande de paiement form.
- Do the work
- Vous pouvez dès le premier courriel reçu, entreprendre vos travaux d’installation ou de conversion, qui doivent être réalisés dans un délai maximal de 24 mois.
- Send the payment request
- Email the signed demande de paiement PDF with the project invoices and photos of the installed equipment.
- One instalment
- La totalité de l’aide est payée en un (1) seul versement, à la livraison des données pour la reddition de comptes du Programme.
Quoted lines are word for word from the source documents; lines marked ◦ are our reading of them.
Everything you need to win ÉcoPerformance — Implantation simplifiée
Not a marketing summary. The actual checklist, intel, and stack strategy reviewers look for.
- 9-document checklist with what each reviewer is actually checking
- Your Application Game Plan — the print-ready PDF the preview below describes
- 5-step application timeline with prep hours per step
- Insider tip from program officers on what separates winners
- 3-program stacking strategy to combine with compatible funding
- Success profile + evaluation criteria — exactly what reviewers score on
Application Playbook
Step-by-step process, required documents, and expenses
Application Steps
Required Documents 9
Eligible Expenses 8
Ineligible Expenses 5
Intake Periods
Deadline Notes
Ineligible Organizations
- 4 more application steps
- 7 more required documents
- 8 eligible expenses
- 5 ineligible expenses
- Intake periods
- Deadline notes
- Ineligible organizations
Funding Stack Strategy
Compatible programs, clawback risk, and combined funding potential
Compatible Programs
Clawback Risk
Medium RiskHow ÉcoPerformance — Implantation simplifiée Compares
Side-by-side with similar programs
| Program | Amount | Difficulty | Payment | Deadline |
|---|---|---|---|---|
| ÉcoPerformance — Implantation simplif... | up to $125 | Easy | Reimbursement | Open continuously — no... |
| Strategic Response Fund (formerly Str... | Minimum $10 million contribution | Hard | Mixed (Advance + Reimb.) | Ongoing — continuous... |
| CanExport SMEs | Up to $50,000 | Moderate | Mixed (Advance + Reimb.) | Between intakes — the... |
| Ocean Supercluster | Up to $5 million | Hard | Reimbursement | Continuous intake (Core... |
| Ontario Innovation Tax Credit | Up to 8% tax credit | Moderate | Tax Credit Offset | Ongoing |
Related Programs
Other programs you might be eligible for
Frequently Asked Questions
Quick answers to the questions founders most often ask about ÉcoPerformance — Implantation simplifiée