Eligibility & Details
What this program funds and who can apply
Program Description
Non-repayable contributions from Forestry Innovation Investment covering up to 100% of the incremental costs of designing and constructing buildings that demonstrate emerging or new mass timber or mass timber-hybrid systems in British Columbia, to a maximum of $500,000 per project. The program pays for what mass timber costs OVER a conventional build — design, engineering, code alternative solutions, testing, virtual design, monitoring — and explicitly not for the mass timber products themselves. Eligible buildings must meet minimum heights by type, and the proponent must fund the majority of the total project cost. Four intakes have run since 2020, funding 24 demonstration buildings and eight research projects with over $11.1 million. The fourth intake's results were announced in September 2025 and no fifth intake is currently posted.
Eligibility Requirements
- Eligible applicants are: for-profit organizations registered in British Columbia (for example owners and developers); not-for-profit organizations incorporated as a not-for-profit corporation or society formed under an Act of Canada or the Province of BC and in good standing under the relevant Act; British Columbia local governments (municipalities and regional districts); and First Nations governments and organizations
- Applications submitted as part of a consortium are encouraged, but the lead applicant must be one of the eligible applicant types
- The building must be in British Columbia
- The main structural building system must be mass timber or mass timber-hybrid — for example mass timber with light wood frame, concrete or steel
- The building must meet minimum heights by type: residential 5+ storeys; mixed-use commercial 3+ storeys; institutional 2+ storeys; industrial 1+ storey. Other heights may be considered if the applicant can clearly explain how the building is uniquely innovative
- The project must support an eligible activity — incremental mass timber design, code analysis and alternative solutions, design-concept validation and product or system testing, research on mass timber systems, virtual design and 3D modelling, GHG emission mitigation documentation, incremental construction fees such as site fire safety and moisture protection, or monitoring of critical components
- The application must demonstrate the need for incremental funding support and how the funding will advance the project in the immediate term
- The proponent must commit to contributing the majority of the total project cost, and must provide evidence of funds and/or in-kind support for their share
- The proponent must demonstrate access to the funding required to complete the project, and must clearly identify any other Government of British Columbia, federal or other government contributions received or applied for
- Total Canadian government assistance (federal, provincial and municipal) cannot exceed 100% of the total eligible incremental project costs being funded through the MTDP
- The application must be complete and provide enough information for a proper evaluation
- Applicants without prior mass timber experience are explicitly encouraged to apply
- Eligible costs can only be incurred after the funding agreement has been signed and executed by both parties; a cost counts as incurred once the work is completed and paid
Quick Assessment
Funding Details
- Amount
- Non-repayable contribution of up to 100% of a project's eligible incremental costs, to a maximum of $500,000 per project. Awards to date have ranged from $137,000 to the $500,000 cap.
- Type
- Grant
- Level
- Provincial
- Co-Funding
- Up to 100% of eligible costs
- Deadline
- No intake currently open — the fourth intake has concluded and no fifth intake has been posted
Program Scorecard
Competition, effort, and approval at a glance
Everything you need to win MTDP
Not a marketing summary. The actual checklist, intel, and stack strategy reviewers look for.
- 11 rejection pitfalls reviewers flag — so you catch them first
- 11-document checklist with what each reviewer is actually checking
- 9-step application timeline with prep hours per step
- Insider tip from program officers on what separates winners
- 3-program stacking strategy to combine with compatible funding
- Success profile + evaluation criteria — exactly what reviewers score on
How to Win
Insider tips, common pitfalls, and what successful applicants look like
Insider TipThe single most misunderstood thing about this program is what it pays for. It funds the INCREMENTAL cost — the difference between building in mass timber and building conventionally — and the mass timber products themselves are explicitly excluded, as are any building materials. So the winning application is really a cost-attribution exercise: quantify the premium across design, approval and construction, and show your work with a Class 'D' cost analysis. Two timing traps. First, eligible costs can only be incurred AFTER a funding agreement is signed by both parties, and the guide is blunt that no obligation exists until then — so early design spend on a project already in motion is unrecoverable. Second, priority goes to projects that can begin or complete in the near term, so a scheme still years from permit will lose to one ready to move. Check the height table before anything else: residential needs 5+ storeys, mixed-use commercial 3+, institutional 2+, industrial 1+, with an exception only where you can argue unique innovation. Two things applicants underuse: consortium applications are encouraged as long as the lead is an eligible applicant, and proponents with no prior mass timber experience are explicitly invited. Finally, priority may go to projects NOT already carrying significant government funding, which is unusual — stacking can count against you here.
Rejection Pitfalls 11
- Applicant is not one of the four eligible applicant types, or a consortium's lead applicant is not eligible
- Building is outside British Columbia, or its main structural system is not mass timber or mass timber-hybrid
- Building falls below the minimum height for its type without a compelling case for unique innovation
Success Profile
BC developers, owners, non-profit housing societies, local governments, First Nations organizations and institutional owners with a multi-storey mass timber or hybrid building at or near design stage, who can fund the majority of the project themselves and want help absorbing the first-time premium. The funded list spans exactly that range: private developers (Westbank, Wesgroup, Reliance Properties, BentallGreenOak, Forefront Communities), non-profit housing societies (More Than A Roof Society, Ronald McDonald House Charities BC & Yukon, Fraser Region Aboriginal Friendship Centre Association), local government (District of Saanich), and institutional owners (Kelowna International Airport). The strongest applications demonstrate something not yet common in their region of BC — a novel structural system, a first-in-province component, or an approach other builders can replicate — and commit to sharing what they learn.
Evaluation Criteria
A two-stage Expression of Interest process. Projects failing any mandatory criterion are eliminated before scoring: complete application, eligible applicant, eligible building, eligible activity, eligible costs, building in B.C., mass timber or hybrid main structural system, demonstrated need for incremental funding, commitment to fund the majority of total project cost with evidence, demonstrated access to the funding required, and total Canadian government assistance not exceeding 100% of eligible incremental costs. Surviving projects are scored by a Technical Review Panel against weighted desired criteria: Feasibility at 40% (technical feasibility, business plan and financial analysis, credible project schedule with preference for near-term completion, and team experience), Innovation and Value at 25% (degree of building innovation and novelty including new products, systems, designs and construction methodology, plus value for investment against program results), and Cost-Competitiveness at 20% (a cost-competitive design and implementation plan including a Class 'D' cost analysis, how incremental costs were quantified, and how the approach could be replicated elsewhere in the B.C. market). A short list then advances to due diligence, where additional information may be requested case-by-case. Priority is given to projects demonstrating mass timber use not already widely accepted or commercialized in the applicant's region of B.C., and may be given to projects not already receiving significant contributions from other government programs.
Application Playbook
Step-by-step process, required documents, and expenses
Application Steps
Required Documents 11
Eligible Expenses 13
- Incremental costs of the mass timber solution — construction documentation, engineering and testing costs, and other related expenditures
- Incremental mass timber design costs: architectural, structural, fire safety, building envelope
- Code analysis and the preparation and detailing of alternative solutions, including feasibility, engineering and scientific studies
- Validation of the design concept, engineering calculations and analysis, and product and system testing needed to support approval by Authorities Having Jurisdiction
- Research on mass timber or hybrid systems — acoustic, fire, seismic, connections
- Virtual design and 3D modelling to support off-site prefabrication
- GHG emission mitigation documentation and life cycle assessment or carbon accounting research
- Additional construction fees specific to mass timber, such as improved construction site fire safety and moisture protection
- Monitoring costs to assure building and occupant safety for critical building components or assemblies
- Professional, consulting and technical services; salaries and benefits
- Data acquisition and acquisition of technical equipment or materials, software and licenses
- Incremental course-of-construction insurance or related premiums placed on mass timber buildings
- Publicity, design, publishing fees, promotional and printing services
Ineligible Expenses 4
- The cost of the mass timber products used to construct the building — explicitly excluded
- Any costs associated with the production or purchase of building materials such as mass timber or softwood lumber products
- Any costs incurred before the funding agreement is signed and executed by both parties
- Costs that would have been incurred anyway had the building been built with traditional materials — only the incremental difference is eligible
Intake Periods
Periodic Expression of Interest intakes, not continuous submission. Four intakes have run since 2020; the fourth has concluded, with results announced by the Province on September 23, 2025. No fifth intake is currently posted. Past intake windows have run roughly three to four months and closed at 20:00 Pacific time on a fixed date. Each intake publishes its own Expression of Interest Guide setting that intake's dates and terms.
Deadline Notes
There is no open intake and no published date for the next one. The program runs periodic Expression of Interest intakes rather than continuous submission: four have run since 2020, and results of the fourth were announced by the Province on September 23, 2025, when four buildings each received $500,000. Neither masstimberbc.ca nor Forestry Innovation Investment's naturallywood.com currently posts a call for applications. Nothing indicates the program has ended — B.C. continues to promote it and the site was updated in 2025 — so treat this as between intakes and watch for a new Expression of Interest Guide. When an intake opens, the window has historically run about three to four months, and each intake publishes its own guide: verify the current rules against that document rather than assuming the previous intake's terms carry over. Practical planning point: eligible costs can only be incurred AFTER a funding agreement is signed by both parties, so a project already under construction when an intake opens has limited room to claim.
Ineligible Organizations
- Organizations not registered in British Columbia (for-profit applicants must be BC-registered)
- Not-for-profits not incorporated as a corporation or society under an Act of Canada or the Province of BC, or not in good standing under that Act
- Applicants whose building is outside British Columbia
- Applicants whose building's main structural system is not mass timber or mass timber-hybrid
- Applicants below the minimum building heights for their building type, absent a clear case for unique innovation
- Applicants unwilling or unable to fund the majority of the total project cost
Applying for MTDP? Our Financial Projections Model ($29) covers the cost-share, matching-fund, and cash-flow math reviewers want to see. Or get all 4 templates in the Founder Pack ($59 · saves $27) →
Funding Stack Strategy
Compatible programs, clawback risk, and combined funding potential
Compatible Programs
Clawback Risk
Low RiskPayment follows a signed funding agreement and costs already incurred and paid, so there is little to recover afterwards. The exposure sits earlier: no obligation to contribute exists until the agreement is executed by both parties, and costs incurred before that signature are not eligible at all — so a proponent who starts spending on the strength of a short-listing or a verbal indication carries that cost themselves. Specific recovery provisions would be set in the individual funding agreement, which the program does not publish.
How MTDP Compares
Side-by-side with similar programs
| Program | Amount | Difficulty | Payment | Deadline |
|---|---|---|---|---|
| BC Mass Timber Demonstration Program ... | Non-repayable contribution of up... | Hard | Reimbursement | No intake currently open... |
| Strategic Response Fund (formerly Str... | Minimum $10 million contribution | Hard | Mixed (Advance + Reimb.) | Ongoing — continuous... |
| CanExport SMEs | Up to $50,000 | Moderate | Mixed (Advance + Reimb.) | Applications accepted... |
| Ontario Innovation Tax Credit | Up to 8% tax credit | Moderate | Tax Credit Offset | Ongoing |
| Quebec R&D Tax Credit (CRIC — Researc... | 20-30% tax credit (CRIC) | Hard | Tax Credit Offset | Ongoing |
Related Programs
Other programs you might be eligible for
Frequently Asked Questions